After receiving my MG some time ago and running it on 2s 50 5000nmh I decided it was time to hot it up a bit. I spent quite a bit of time looking through the MG forums at what people have done and the problems they have had. In order to fix the weak factory join that joins the top deck and bottom hull. I decided cut the hull apart and removed the balsa wood and bog from the join as this is the weak spot. I laid two layers one chopped mesh one cross mesh the full length. I did the same across the front and back too and now the join is supper strong.
I also decided to relocate water outlet to the back left top side. The second step was to fix the riding pads as they had dips and a slight curve, so it was time to blue print the riding pads and sharpen up the edges at the same time. I am now at the painting stage. I still have too glass in motor mount and Carbon Fiber Battery Tray.
I also decided to relocate water outlet to the back left top side. The second step was to fix the riding pads as they had dips and a slight curve, so it was time to blue print the riding pads and sharpen up the edges at the same time. I am now at the painting stage. I still have too glass in motor mount and Carbon Fiber Battery Tray.
Comment