So, the biggest thing that bugs me about FE is the fact that if it rains on practice day, I have to discharge ALL my batts back to storage. It takes as much as 1-2 hours on most chargers with limited discharge rates. I've heard various other complain about this.
So here is the proposal.... Can we discharge as usual thru our existing chargers (uses the voltage monitoring system of the charger for safety), and connect another load in parallel (ex: light bulbs) to speed things up a little. I'm not talking about speeding it up to 50amps or anything, just a little faster.
Will this work?? Is it safe?? Anyone?? Thanks!!
So here is the proposal.... Can we discharge as usual thru our existing chargers (uses the voltage monitoring system of the charger for safety), and connect another load in parallel (ex: light bulbs) to speed things up a little. I'm not talking about speeding it up to 50amps or anything, just a little faster.
Will this work?? Is it safe?? Anyone?? Thanks!!
Comment