"OVAL 14.8v CF Hydro
Collapse
X
-
Tags: None
-
I have not been able to stand more than 20 minutes this summer due to my herna. So I have ben spending most of my time in the 1974 Early Bronco just came back fron the Roubicon. I am having surgery this monday on it.Comment
-
They have the same top of the tub, the rest of the two boats are different.Comment
-
-
They are ready to order now. The real question is how long does it take to build one? And that depends on my health and work load. Each order takes between 2 to 6 month to build depending on how much other work comes in and how I feel. I am slower in the summer and get more done in the winter. I like to rock crawl and run my boats in the summer and there is a lot of work that comes in durring the summer.Comment
-
I guess I should post finished pictures in this thread. I am in and out of the shop today. I will be back tomorrow threw friday.
Comment
Comment