Work I started this due to the lack of parts for the little cat. As pictured the hardware was pulled and hull cleanup is in progress. When I have it complete Carbon fiber cloth will be put down on the tunnel and down both side where the motor mounts stuffing tubes where. I will then install a single KB9XL on a Hex120 along with the pictured strut and dual rudder system. I am going to run this on S6 getting around 31K in rpm. I have yet to buy the KB. The rudder is in transit. The strut is 1/4 inch. I need to look into a 1/4 drop down propshaft to 3/16th. If not I will replace the strut. Whats delivered in the mail each day will determine what gets done to the boat.







Comment