Another evening of building. Soldered up the second cable. Drilled the sponson tubes and aligned everything.
Bolted it all together, just a mock up since I've still got epoxy on the outside and painting to do yet.
Last picture shows a clean head on front view.
Using electrical tape for now instead of heat shrink tubing for test fitting...
Sent from my SM-G950U1 using Tapatalk
Bookmarks