slow but steady, dont want to mess anything up on the first major FE build. dont wanna end up like this 
so i purchased the hull in january and just now got around to putting it together. so far i have a UL1 2030kv motor, water cooled motor mount, a 3/16 strut with stand off rudder, two dual through hull water pickups, flex cable assembly with teflon liner and brass tube, and carbon fiber servo mount.
so far i have laid in 2 layers of CF in the hull and put a half piece in between the 2 full layers under the motor mount are for extra support (overkill, possibly) as well as a layer where the strut mounts through the transom. heres a few pics so far.




still needs to be sanded and cleaned up, but that was about 20 min after the resin hardened.

so i purchased the hull in january and just now got around to putting it together. so far i have a UL1 2030kv motor, water cooled motor mount, a 3/16 strut with stand off rudder, two dual through hull water pickups, flex cable assembly with teflon liner and brass tube, and carbon fiber servo mount.
so far i have laid in 2 layers of CF in the hull and put a half piece in between the 2 full layers under the motor mount are for extra support (overkill, possibly) as well as a layer where the strut mounts through the transom. heres a few pics so far.




still needs to be sanded and cleaned up, but that was about 20 min after the resin hardened.